Tulsa & Rogers counties · Tulsa metro
Metal buildings in Collinsville, OK.
We supply acreage shops, farm buildings, boat and RV storage and more across Collinsville and the north side of the Tulsa metro. Our work reaches from Owasso to Oologah, and anywhere else you’re building. Collinsville sits across the Tulsa and Rogers county line, so the county decides the paperwork.
Unincorporated Tulsa County
Permits barns
Rogers County
Permits countywide
Tulsa County build window
1 year
State code since Sept. 14
2024 IBC & IRC
Collinsville permits inside city limits. Outside them, Tulsa County and Rogers County both require building permits for outbuildings.
What people build around Collinsville
It’s a small town with acreage on every side, and the farm ground runs north toward Oologah Lake.
Acreage shops & garages
Shops, garages and RV storage go up on the acreage around town.
Farm buildings
Hay barns, equipment storage and livestock buildings go up north and east of town.
Boat & RV storage
Lake traffic calls for tall-door buildings, where eave height sets the price.
Finished space
Steel truss takes drywall directly, so there’s no wood wall to build inside the steel.
We also work in tubular steel, cold-formed steel and red iron. See what a steel building costs.
Permitting metal buildings in Collinsville and the county around it
The city permits inside its limits. Outside them, both counties issue building permits, and they run them differently.
Inside Collinsville
- Permits go through the city’s building inspector.
- Zoning comes from the mapping published through the Tulsa County Assessor.
- Fees depend on size and use, and the inspector sets them when the permit is ready.
Unincorporated Tulsa County
- The county requires a building permit and floodplain clearance before any structure, barns included.
- A county driveway permit comes before the building permit.
- Work has to start within six months and finish within one year.
- Call Tulsa County Inspections at (918) 596-5293.
Rogers County
- Permanent structures need a building permit everywhere in the county.
- Drawings are attached to the application.
- Permits run two years but lapse after six months without activity.
The county line decides the paperwork. Tulsa County gives you a year to finish. Rogers County gives you two, as long as work doesn’t stall for six months. Either way the drawings go to a reviewer, so our wet-sealed engineering goes in with the application.
We also serve Owasso, Oologah, Sperry, Talala and the farm ground between them. See the Tulsa metro or all of Oklahoma.
Start with a conversation
Let’s talk about your Collinsville project.
Tell us what you’re planning and where you’re building. We’ll help you work out the next steps.
- Tell us what and whereSend us the size, how you’ll use the building and the address.
- We check the siteWe confirm who permits the address and which code and loads apply.
- You get a clear recommendationWe recommend the frame that fits and price it against the alternatives.