Bolivar, MO

417-218-8348

St. Louis, MO

314-536-8688

Henderson County · North Carolina

Metal buildings in Hendersonville, NC.

We supply shops, garages, storage buildings and more across Hendersonville. Our work reaches from in-town neighborhoods to estate lots on the city’s edges, and anywhere else you’re building.

Size cap

None in the code

Front setback

40 ft

Side & rear setback

10 ft

Max height

35 ft

From the City of Hendersonville Zoning Ordinance, Sections 5-1 and 6-1-8, amended through 2025. Figures shown for the R-40 Estate Residential district.

What people build in Hendersonville

Hendersonville sets no square-footage cap on accessory buildings; setbacks set the limits.

Shops & garages

On R-40 estate lots, accessory buildings sit 40 feet from the front and 10 feet from side and rear lines.

Height

Accessory buildings follow the district’s 35-foot height limit.

Farming

Agriculture is permitted by right in the R-40 district.

Containers

Storage containers aren’t allowed in residential districts.

We work in tubular steel, cold-formed steel, steel truss and red iron. See what a steel building costs.

Permitting metal buildings in Hendersonville

Hendersonville keeps accessory buildings out of required front yards and corner side yards.

Placement

  • Not in any required front yard.
  • On corner lots, not in the required front or side yard.

R-40 setbacks

  • Accessory buildings: front 40 feet, side 10 feet, rear 10 feet.
  • Lots are at least 40,000 sq ft and 125 feet wide.

Other districts

  • Smaller-lot districts set their own accessory setbacks.
  • Accessory buildings meet the district setbacks in all cases.

In Hendersonville, setbacks are the only limit. On an estate lot, a large shop fits as long as it stays 10 feet from the side and rear lines and under 35 feet.

In smaller-lot residential districts, we confirm the district’s setbacks before ordering. See all of North Carolina.

Start with a conversation

Let’s talk about your Hendersonville project.

Tell us what you’re planning and where you’re building. We’ll help you work out the next steps.

  1. Tell us what and whereSend us the size, how you’ll use the building and the address.
  2. We check the siteWe confirm who permits the address and which code and loads apply.
  3. You get a clear recommendationWe recommend the frame that fits and price it against the alternatives.