Metal buildings in Alton, IL.

We supply shops, garages, farm buildings, commercial buildings and more across Alton and the river bend. Our work reaches from Alton and Godfrey to the farm ground around Bethalto and Brighton, and anywhere else you’re building. A city permit lapses if work doesn’t start within three months.

Building code

2021 IBC

Permit required

Over 100 sq ft

Start work within

3 months

Finish within

9 months

These are City of Alton rules. Godfrey and unincorporated Madison County permit separately.

What people build around Alton

Alton’s older neighborhoods sit on the river bluffs. North and east of town, the ground opens into acreage and farmland.

Garages on city lots

Bluff-side lots are often tight and sloped. We work from your survey before settling on a size.

Acreage shops

Tubular steel is usually the answer for an unfinished shop under sixty feet wide.

Machine sheds

Equipment storage goes up on the farm ground toward Bethalto and Brighton. Red iron takes over past eighty feet or for combine doors.

Barndominium shells

Steel truss is the fit here. Drywall attaches to the frame, so there’s no second wall to build.

Permitted commercial work often suits cold-formed steel, with a finished eave standard. See what a steel building costs.

Permitting metal buildings in Alton and Madison County

The city and the county are on different code editions, and Alton adds its own rules on permit timing.

Inside Alton

  • The city is on the 2021 IBC and IRC.
  • Only sheds of 100 sq ft or less are exempt from a permit.
  • Work has to start within three months of the permit and finish within nine.

Unincorporated Madison County

  • The county is on the 2012 IBC and IRC.
  • Building permits are applied for in person at the Building & Zoning counter.
  • Planning & Development is at 157 N. Main St, Suite 254, Edwardsville. Call (618) 296-4468.

Farm buildings in Illinois

  • State law keeps counties from regulating or requiring permits for farm buildings.
  • Farming has to be the main activity on the land.
  • Setback lines still apply.

In Alton, time the permit to the delivery. A city permit lapses if work doesn’t start within three months, and the building has to be finished within nine. We line the permit up with the delivery schedule so it doesn’t expire while the steel is on order.

We also serve Godfrey, Bethalto, East Alton, Wood River and Brighton. See Edwardsville, the St. Louis metro or all of Illinois.

Start with a conversation

Let’s talk about your Alton project.

Tell us what you’re planning and where you’re building. We’ll help you work out the next steps.

  1. Tell us what and whereSend us the size, how you’ll use the building and the address.
  2. We check the siteWe confirm who permits the address and which code and loads apply.
  3. You get a clear recommendationWe recommend the frame that fits and price it against the alternatives.